Rapid Response with the Comet Combustion System: Emergency Burner Replacement

When the U.S. Postal Service in Kearny, NJ, faced an urgent burner failure, there was no time to waste. Essential facilities like this rely on uninterrupted operation, and operators needed to find a high-performance replacement quickly.

That’s where Preferred Utilities’ Comet Combustion System saved the day. We provided a 300 HP in-stock Comet burner within 48 hours, ensuring minimal disruption. Thanks to its versatile design and seamless integration with the FlexFit Burner Management System, our Tri-State representative, ACS, completed installation and startup quickly and efficiently.

The Comet Combustion System is designed for reliability, efficiency, and ease of integration, making it the ideal solution for facilities that need affordable retrofits with limited downtime. At Preferred, we design Made in the USA solutions that keep mission-critical operations running—because when the heat is on, Preferred delivers.

For more information on the Comet Combustion System, visit our website.

Leave a Reply

Your email address will not be published. Required fields are marked *